Service

Medicare Advantage Network Adequacy and Health Service Delivery Readiness (42 CFR 422.116)

Medicare Advantage (MA) network adequacy under 42 CFR 422.116 measures network access for network-based MA plans other than MSA plans. Beginning with contract year 2024, new or expanding service area applicants must demonstrate compliance in their application, and CMS may deny the application based on its network evaluation. Integral Healthcare Solutions (IHS) drafts supporting procedures and evidence files; your organization files with CMS.

Last updated: November 2026

CFR text is the eCFR build of November 24, 2026. CMS pages and files were opened November 25, 2026.

What does 42 CFR 422.116 require of a Medicare Advantage plan?

A network-based MA plan other than an MSA plan must meet maximum time and distance standards and minimum contracted provider and facility numbers (42 CFR 422.116(a)(2)–(3)). Counting requires proximity to at least one beneficiary in the MA Medicare Sample Census; telehealth-only providers do not count toward the minimum. The rule lists 29 provider-specialty and 14 facility-specialty types. Excluded are specialized, long-term care and pediatric hospitals, residential-facility-only providers, and providers and facilities contracted only for commercial, Medicaid or other products ((a)(3)–(4), (b), (e)(1)).

ElementWhat the rule saysCite
Coverage percentageBefore applicable credits: at least 90 percent of beneficiaries in large metro and metro counties and at least 85 percent in micro, rural or CEAC counties must have access within the standards to at least one provider or facility of each specialty type(d)(4)
Base time and distance, Primary CareLarge metro 10 minutes and 5 miles; metro 15 and 10; micro 30 and 20; rural 40 and 30; CEAC 70 and 60(d)(2)
Minimum number, Primary Care1.67 per 1,000 beneficiaries in large metro and metro counties, 1.42 in micro, rural and CEAC, applied to beneficiaries required to cover, rounded up(e)(3)

Where do each year's numbers come from?

CMS publishes an HSD (Health Service Delivery) Reference File with the minimum numbers, time and distance standards and ratios, and a Provider Supply file of available providers and facilities (422.116(a)(5)). Customization may only raise the base standards ((d)(3)(iv)). The 2026 HSD Reference File, updated December 17, 2025, has a Criteria Changes tab listing every county and specialty whose criteria changed from 2025: by our count 6,862 instances, of which 4,549 are customizations, 1,506 return to base criteria and 807 follow a county designation change. In that file Autauga County, Alabama (metro, 12,236 beneficiaries, 1,296 required to cover) shows a Primary Care minimum of 3 and a 25-minute, 15-mile standard against the 15 and 10 base.

Who needs this, and what triggers it?

MA organizations and applicants for a new contract or service area expansion need it, usually through compliance, network management and regulatory affairs leads. Triggers are an application window, the annual HSD Reference File update, a Notice of Intent to Deny, a significant contract termination, a network access complaint or a gap the plan finds itself.

What must an applicant show, and when?

The CY2027 Medicare Advantage (Part C) Application asks the applicant to attest that it will have a contracted network meeting current 422.116 criteria in each county of the requested service area for the entire contract year, ready on January 1, and that it will monitor and maintain that network (items 3.6.8 and 3.6.9). Applicants who attest yes upload provider and facility HSD tables in HPMS. CMS says the requirements must be met no later than the final upload opportunity, the response to a Notice of Intent to Deny. That cycle's applications were due February 11, 2026, with dates subject to change. The CMS applications page (last modified May 26, 2026) lists no later application; check CMS for the next cycle's dates.

New or expanding service area applicants receive a 10-percentage-point coverage credit for the contracted network in the pending service area during application and review. Applicants may use an LOI signed by both parties with a provider or facility with which they have started or intend to negotiate. They must notify CMS of each use and supply copies on request in CMS’s required form and manner. Both allowances end at contract-year start; approved organizations must then fully comply, including signed contracts (422.116(d)(7)). A contract-determination hearing request is due within 15 calendar days after receipt of the notice (422.662(b)).

How often does CMS review an MA network after contract start?

CMS guidance (last updated December 2024) says CMS reviews contract-level networks on a triennial basis and may review after a triggering event: an application, a significant provider or facility contract termination, a network access complaint, or a network gap the organization discloses. Organizations must monitor continuously and notify their CMS Account Managers on discovering a network is out of compliance. Applicants that used Letters of Intent join the triennial review in their first operating year.

Access has its own written standards. For coordinated care plans, the MA organization must continuously monitor access to care and member services and take corrective action as necessary to meet these primary care and behavioral health appointment standards: urgently needed services or emergencies immediately, care the enrollee requires medical attention for but that is neither emergency nor urgent within 7 business days, and routine and preventive care within 30 business days (42 CFR 422.112(a)(6)(i)).

Where do MA network submissions go wrong?

How does IHS help with MA network adequacy readiness?

IHS turns 422.116, 422.112(a) and the CMS guidance into procedures your staff can follow. Thomas G. Goddard, JD, PhD, IHS founder and former URAC Chief Operating Officer and General Counsel, leads it. This is Compliance Services, one of three IHS practice lines with Accreditation Consulting and Program Development.

What IHS drafts

IHS assesses your procedures against the rule and guidance, maps documents and evidence, and drafts for your approval a network monitoring procedure, an HSD table preparation and validation procedure, an exception evidence template and decision procedure, a Letter of Intent register, a triggering-event escalation procedure, appointment wait time standards and a yearly reference-file review. A mock file review tests the set.

What you supply

Your contract list, provider data, HSD tables and Automated Criteria Check results, current policies, and your network and compliance leaders' sign-off.

The real limit

IHS does not build or contract the network, run the HPMS uploads, or write bids. Your organization files with and corresponds with CMS. IHS drafts text for your named contact to send.

What to have ready

IHS checklist based on 42 CFR 422.116 and 422.112 (eCFR build November 24, 2026), and Medicare Advantage and Section 1876 Cost Plan Network Adequacy Guidance (December 2024; page opened November 25, 2026). References below use these versions.

  1. Current contract and Letter of Intent list by county and specialty (422.116(d)(7), (e)(1)).
  2. The latest Automated Criteria Check results and failed-county reports (guidance section 3.3).
  3. HSD tables with exact names, office addresses and specialty codes (guidance section 2.2).
  4. Supply file validation notes (guidance section 2.3).
  5. Exception requests, with evidence files kept apart from the forms (422.116(f); guidance section 4.3).
  6. Appointment wait time standards and monitoring reports (422.112(a)(6)(i)).
  7. A record of contract terminations, access complaints and network gaps (guidance section 3.1).

The free introductory call is where IHS walks through the list with you.

How does this compare with other IHS pages?

Our new-plan application readiness page covers the whole first application. This page covers the network adequacy evidence set and its upkeep. Our provider directory accuracy page covers directory data, and our Medicaid network adequacy page covers the separate Medicaid managed care rules.

What does this work cost?

CMS does not publish a fee schedule on the pages we reviewed. IHS scopes each engagement after a free introductory call. Scope drivers are the counties in the service area, the plan types and the number of exceptions and Letters of Intent.

What this is not

Frequently asked questions

What does 42 CFR 422.116 require of a Medicare Advantage plan?

A network-based MA plan must demonstrate an adequate contracted provider network by meeting maximum time and distance standards and contracting with a specified minimum number of each provider and facility-specialty type (42 CFR 422.116(a)(2)(i), (a)(3)). MSA plans are excluded from paragraph (a)(2)(i).

Do Medicare Advantage applicants have to show network adequacy in the application?

Yes. Beginning with contract year 2024, an applicant for a new or expanding service area must demonstrate compliance with 422.116 as part of its application, and CMS may deny an application on the basis of an evaluation of the applicant's network (422.116(a)(2)(ii)). The applicant also receives a 10-percentage-point credit toward the coverage percentage for the pending service area, at application and during review (422.116(d)(7)).

What coverage percentage must a plan reach?

At least 90 percent of beneficiaries in large metro and metro counties, and at least 85 percent in micro, rural or CEAC counties, must have access to at least one provider or facility of each specialty type within the published time and distance standards (422.116(d)(4)). CEAC means counties with extreme access considerations.

What is a Letter of Intent in MA network adequacy?

During application and review, an applicant may use a Letter of Intent signed by both parties with a provider or facility with which it has started or intends to negotiate. It must notify CMS of each use and supply copies on request in CMS’s required form and manner. The allowance ends at contract-year start; approved organizations must then fully comply, including signed contracts (422.116(d)(7)).

When can a plan request an exception?

Under 422.116(f)(1)(i), a plan may request an exception when providers or facilities are unavailable to meet county/specialty criteria and it has contracted with alternatives, possibly beyond time/distance limits, currently accessible to most enrollees consistent with local care patterns. Facility-based Institutional-Special Needs Plans (I-SNPs) have additional grounds under (f)(1)(ii), subject to (f)(2)–(3). CMS guidance generally rejects unsuccessful contract negotiations or unwillingness to contract with otherwise qualified providers because of internal standards, but recognizes the facility-based I-SNP care-delivery exception.

How often does CMS review an MA network?

CMS guidance says it reviews contract-level networks on a triennial basis. It may also review after an application, a significant provider or facility contract termination, a network access complaint, or a network gap the organization discloses.

Does telehealth count toward network adequacy?

For an applicable county and specialty listed in 422.116(d)(5), a plan receives a 10-percentage-point coverage credit when its contracted network includes a provider furnishing additional telehealth benefits as defined in 422.135. A telehealth-only provider does not count toward the minimum (422.116(e)(1)(ii)).

Does IHS contact CMS or file the network submission?

No. Integral Healthcare Solutions drafts the procedures, evidence templates and draft text. Your organization runs the HPMS uploads, signs the attestations and files with and corresponds with CMS, and your leaders approve every document.

Recent changes

  • CMS Proposes Reforms to Strengthen Competition, Elevate Care Quality, and Expand Beneficiary Choice in Medicare Advantage

    · Centers for Medicare & Medicaid Services

    Centers for Medicare & Medicaid Services states: “The Centers for Medicare & Medicaid Services (CMS) issued a proposed rule today that is intended to revitalize competition in Medicare Advantage (MA) and Part D and give seniors more meaningful choices in how they receive care. If finalized, the proposed policy updates, alongside a new CMS Innovation Center (CMMI) model, would break down administrative barriers for new market entrants, elevate prevention through nutrition to improve MA seniors' health outcomes, and pioneer localized care innovations.”

    Checked

  • IDR Gateway Now Available

    · Centers for Medicare & Medicaid Services

    Centers for Medicare & Medicaid Services states: “On November 13, 2026, the Department of Health and Human Services, the Department of Labor, and the Department of the Treasury (the Departments) launched the Independent Dispute Resolution (IDR) Gateway, a new platform for group health plans, health insurance issuers, providers, facilities, and providers of air ambulance services (collectively referred to as "parties") and their representatives to manage disputes under the Federal IDR process.”

    Checked

  • Medicare Drug Price Negotiation Program and Medicare Prescription Drug Benefit Program

    · Centers for Medicare & Medicaid Services

    Full title: Medicare Drug Price Negotiation Program and Medicare Prescription Drug Benefit Program (Final rule; FR Doc. 2026-22792)

    Centers for Medicare & Medicaid Services states: “This rule finalizes and codifies the Medicare Drug Price Negotiation Program ("Negotiation Program") and establishes certain new policies for the Negotiation Program and the Medicare Prescription Drug Benefit Program ("Part D Program") as required by the Inflation Reduction Act of 2022. This final rule also finalizes a proposed policy for specific fixed combination drugs that are new formulations.”

    Checked

  • Electronic Prior Authorization: Employers Back Expansion to Self-Funded Health Plans

    · Centers for Medicare & Medicaid Services

    Centers for Medicare & Medicaid Services states: “More patients and doctors could spend less time navigating faxes, phone calls, and paperwork as leading employers work to expand electronic prior authorization for their self-funded health plans. CMS and the U.S. Department of Labor announced that 5 leading employers have signed a statement of support to make the technical improvements and other capabilities being developed through the 2025 Prior Authorization Pledge available to employers that sponsor self-funded health plans.”

    Checked

  • CMS Proposes Reforms to Strengthen Transparency & Affordability in Medicare Advantage and Part D

    · Centers for Medicare & Medicaid Services

    Centers for Medicare & Medicaid Services states: “CMS issued a proposed rule that would improve the accuracy of provider directories for Medicare Advantage plans, establish transparency and compensation requirements for Pharmacy Benefit Managers, and deliver enhanced cost-saving protections for low-income Medicare beneficiaries.”

    Checked

More: CMS · Health plans and Medicare Advantage · all standards changes

Talk with IHS's CEO

A 30-minute introductory meeting with Thomas G. Goddard, JD, PhD, to scope what your organization needs.

Schedule a Free Discovery Session