A North Carolina nursing facility certificate of need (CON) application asks the Department of Health and Human Services for approval to develop nursing home beds, relocate them or replace a facility. Review uses the statutory criteria and applicable State Medical Facilities Plan policies and need determinations; the route depends on the project. Integral Healthcare Solutions (IHS) prepares the application for the applicant to approve, sign and file: the narrative, the utilization and payor-mix assumptions, the criterion map and the review calendar.
What is a North Carolina nursing facility certificate of need application?
It is the application for a certificate under Chapter 131E, Article 9 of the North Carolina General Statutes (page opened November 26, 2026) for a nursing home project. Section 131E-176(17b) defines a nursing home facility as a health service facility whose bed complement is composed principally of nursing home facility beds. A change in bed capacity is itself a new institutional health service under 131E-176(16)c.
The Division's FAQ page (page opened November 26, 2026) says an application may not be needed and directs applicants to the county project analyst. The statutory capital expenditure threshold of four million dollars is adjusted each September 30, and the Division's memo of October 1, 2026 (page opened November 26, 2026) lists it as four million sixty-four thousand dollars. Verify current thresholds with the Division.
How does North Carolina decide how many nursing home beds a county needs?
The State Medical Facilities Plan decides it, county by county, and the Plan's need determination is a determinative limit on the beds the Division can approve (131E-183(a)(1)). In the Proposed 2027 State Medical Facilities Plan (page opened November 26, 2026), Chapter 10 treats each of the 100 counties as a separate service area. It projects bed need for a year five years past the current reporting year, which is 2030 in this edition.
The method multiplies the projected bed-use rate per 1,000 people by the county’s projected 2030 civilian population in thousands, divides by 0.95 and compares the result with the planning inventory. A deficit becomes a need determination only if the Chapter 10 conditions are met. For example, Step 7(c) uses a deficit index of at least 10 percent and adjusted licensed-bed occupancy of at least 90 percent for the current reporting year; the deficit is rounded to the nearest 10, capped at 150 beds.
Proposed Table 10C shows Davie’s 31-bed deficit, 11.87 percent deficit magnitude and 91.5 percent occupancy, with need of 30 beds; Hoke’s figures are 20, 13.41 percent and 92.8 percent, with need of 20 beds. IHS reads these as Step 7(c) results as of November 26, 2026; the table does not identify the step.
The draft cover prints “Effective July 1, 2026”; it is not an approved 2027 Plan. Table 10D lists the deadline and beginning review date for both counties as to be determined, and the Governor's deadline to approve the Plan is December 31. The Division's Plan index (page opened November 26, 2026) lists only the proposed edition for 2027 so every figure is proposed until the approved Plan is posted.
Who needs it and what triggers it?
Operators and developers of skilled nursing facilities need it when a project is a new institutional health service and no exemption applies.
- A need determination in Table 10D. Any person can apply, not just the facility that generated the need. Proposed 2027 Chapter 3 places these beds in category B.1, with proposed review starts of March 1, August 1 and November 1. A need determination has one scheduled review date and one absolute deadline in the year.
- Relocation of existing nursing home beds within the same service area (category B.1) or to another service area (category B.2, Policy NH-6).
- New or replacement nursing facilities: Policy NH-8 requires pursuing innovative environmental design addressing residents’ quality of care and quality of life.
- Nursing capacity in a continuing care retirement community under Policy NH-2, which sets its own conditions, including no Medicaid certification.
What do the nursing facility rules add to the statute?
Rule .1102(b) in 10A NCAC Subchapter 14C (page opened November 26, 2026) applies to an applicant proposing nursing home beds under a need determination in the Plan in effect on the first day of the review period. Projections must cover existing, approved and proposed beds for each of the first three full fiscal years after project completion, with at least 90 percent occupancy in the third year and supporting assumptions and methodology. Maximum capacity is those beds multiplied by 365 days.
The Division's application form for all other types of services (page opened November 26, 2026) turns the statute into Sections A through P and a Section Q workbook. Section L requests payor history for the last full fiscal year before submission and projected mix for the third full fiscal year after project completion, with assumptions for each source; change-of-scope applicants skip to Question 6. Section O.6(a) identifies Form O nursing facilities with DHSR or CMS Level 4 substandard-care findings in the 18 months before submission, limited to unchallenged findings or findings upheld after challenge.
The September 2026 Pitt findings (page opened November 26, 2026) found an application nonconforming partly because its projected payor mix lacked methodology and assumptions.
Approval of new or expanded nursing bed capacity carries a condition setting the earliest date for Medicaid certification (131E-186(a)), and rule .0204 prohibits amendments but permits responses to agency requests for additional information after review begins.
How IHS helps
IHS prepares the application through five steps.
- Gap assessment against the applicable statute, rules, Plan and filing deadline.
- Evidence map tying each form section to the applicable criteria, rules and policies.
- Assumptions memo: utilization, occupancy and payor-mix methodology with each assumption traced to its source.
- Narrative drafting for applicant approval, with clinical content approved by the client’s clinicians.
- Mock review, completeness check and readiness support, with review and progress-report calendars.
The applicant supplies the project facts, cost certification, financial projections, signed certification page and fee, files, and attends any hearing. IHS is a consulting firm, not a law firm. Contested-case hearings are counsel's work, and IHS does not contact or file with the Division.
What to have ready
- The governing Plan and county need entry: Proposed 2027 SMFP, Tables 10C–10D; verify the approved edition.
- The review category and deadline: 10A NCAC 14C .0202(2) and .0203(d), current text opened November 26, 2026.
- The project description and statutory bed-capacity change: G.S. 131E-176(5) and (16)c, current text opened November 26, 2026.
- For need-determination beds, utilization and occupancy projections covering existing, approved and proposed beds: 10A NCAC 14C .1102(b), readopted January 1, 2023.
- Payor history, projections and assumptions, following applicable form instructions: CON application, Section L, version opened November 26, 2026.
- Where alternatives exist, the least-costly or most-effective rationale: G.S. 131E-183(a)(4), current text opened November 26, 2026.
- Capital-cost assumptions and, for new or replacement facilities, the design response: application Section F, version opened November 26, 2026; 2026 SMFP, Policy NH-8.
- North Carolina facilities owned, operated or managed by the applicant or a related entity, providing the proposed service components, and their quality records: application Section O, version opened November 26, 2026.
- The full fee, each applicant’s signed certification and timely receipt of the original and copy: 10A NCAC 14C .0203(e)–(f), current text opened November 26, 2026. The original requires covers and metal paper fasteners; the copy may match it or use an unencrypted, non-password-protected USB drive.
The next step is the free introductory call.
How do the routes compare?
| Route | Governing text | What the applicant shows |
|---|---|---|
| Need determination | Plan Chapter 10, Table 10D; 131E-183(a)(1) | Conformity with the need determination, 90 percent third-year occupancy, payor-mix assumptions |
| Relocation to another service area | Policy NH-6; category B.2 | Existing licensed beds; no creation or increase of a deficit in the losing county or surplus in the gaining county, under the Plan effective when review begins |
| Continuing care retirement community nursing beds | Policy NH-2 | Every listed condition, including no Medicaid certification |
| Qualifying renovation, same-site replacement or expansion | 131E-184(e) | Above-threshold capital expenditure solely for an existing nursing home; no statutory bed-capacity change or additional facility or other new institutional health service. Prior written notice must document private-room conversion, homelike dining, or residential/common-area improvements to residents’ quality of life. |
What does it cost?
The Division charges a filing fee set in 131E-182(c): 5,000 USD plus 0.3 percent of proposed capital expenditure exceeding 1,000,000 USD, capped at 50,000 USD, and not refundable even if the application is denied (Division overview, page opened November 26, 2026). Verify current fees with the Division of Health Service Regulation. IHS scopes each engagement after a free introductory call.
What this is not
- It is not legal advice. IHS is a consulting firm, not a law firm, and counsel reads the statute, rules and Plan for the applicant.
- It is not a prediction or guarantee of the Division's decision.
- It is not a filing service. The applicant signs, pays and files, and IHS does not contact the Division.
Frequently asked questions
Does a North Carolina nursing home need a certificate of need?
Developing a nursing home, making a statutory change in bed capacity or incurring a covered health-service capital expenditure above the adjusted threshold requires a CON unless an exemption applies. The Division’s FAQ directs applicants to the county project analyst when applicability is uncertain.
How does the State Medical Facilities Plan set nursing home bed need?
Chapter 10 projects each county's bed use five years past the reporting year, divides by a 95 percent vacancy factor and compares the result with the planning inventory. A deficit becomes a need determination only if the chapter's conditions are met, up to 150 beds per county.
What does the Proposed 2027 plan show for Davie and Hoke?
Table 10D lists 30 nursing care beds for Davie County and 20 for Hoke County, with the deadline and review date to be determined. Read the approved table before relying on either number.
Can anyone apply for a need determination, and when is the deadline?
The Plan says any person can apply. The deadline is 5:00 p.m. on the 15th day of the month before the review period begins, or the next business day if the 15th is a weekend or State holiday, and it is absolute.
What occupancy must a nursing home application project?
For beds under a need determination in the Plan effective on the first day of review, .1102(b) requires utilization projections for existing, approved and proposed beds for each of the first three full fiscal years after project completion. The applicant must project an occupancy rate of at least 90 percent of maximum capacity for the third full fiscal year, with assumptions and methodology for both projections.
What payor mix information does the application require?
Section L requests payor history for the last full fiscal year before submission and projected mix for the third full fiscal year after project completion, with assumptions for each source. Change-of-scope applicants skip to Question 6. A September 2026 competitive review found an application nonconforming partly because its payor-mix projections lacked supporting methodology.
Can nursing home beds be relocated to another county?
Policy NH-6 permits proposals to relocate existing licensed nursing home beds across counties without creating or increasing a deficit in the losing county or a surplus in the gaining county, as shown in the Plan effective when review begins. The project still requires CON review against applicable criteria.
What does IHS prepare, and what does the applicant do?
IHS prepares the narrative, criterion map, assumptions and review calendar for the applicant to approve. The applicant supplies the facts, signs, pays and files. Contested-case hearings are counsel's work, and IHS does not contact the Division.